Nataly Perez Redondo
  • Home
  • Real Estate Listings
    • Properties Half Map
    • Property Gallery List
  • York Region
    • Living in Vaughan
    • Living in Markham
    • Living in Richmond Hill
  • FAQs
  • Real Estate Blog
  • Contact
647-997-9321
My Favorites
Nataly Perez Redondo
  • Home
  • Real Estate Listings
    • Properties Half Map
    • Property Gallery List
  • York Region
    • Living in Vaughan
    • Living in Markham
    • Living in Richmond Hill
  • FAQs
  • Real Estate Blog
  • Contact
647-997-9321
My Favorites
Price Range
From $709,500.00 To $1,149,000.00
Looking for certain features
Advance Search
Active Residential Condo Apartment

2 Arbourvale Common N/A, St. Catharines, ON L2T 2Z9

$799,000.00

2 Arbourvale Common N/A

40 Photos

Overview

|
Property ID : X13698952
Bedrooms
1
Bathrooms
2

Description

Welcome to The Cardin at Coveteur, Niagara’s newest address for luxury living. This stunning second-floor suite offers 1, 160 sq. ft. of beautifully finished living space with 1 spacious bedroom and captivating West-facing views of the surrounding natural scenery. Designed for modern elegance, this open-concept suite features 10-ft ceilings, 8-ft doors, and an architecturally distinctive circular foyer. Personalize your home with one of four curated designer decor styles Parisian, Scandinavian Chic, New York Loft, or European Traveller each crafted for timeless sophistication. The kitchen boasts designer cabinetry with crown moulding, an eat-in island perfect for entertaining and a spacious pantry. Enjoy year-round comfort with an Echobee smart thermostat and an individual high-efficiency MagicPak system with fresh air ventilation. Elegant three-pane sliding doors open to a private balcony offering serene views. Building amenities include a landscaped outdoor terrace, party room with kitchen, library and lounge with two-sided fireplace, and a fitness and yoga studio. One underground parking space and locker included. Built strong with Insulated Concrete Forms (ICF) for superior quality and energy efficiency. Construction is underway with occupancy expected Fall 2026.